Facade Stone: 11,000 square meters Floor Paving: 3,000 square meters Block Wall Construction with Lightweight Blocks: 7,500 square meters Frameless Glass Facade: 250 square meters Rebar Installation and Light Steel Works: 170 tons Steel Structure: 100 tons Concrete Pouring: 750 cubic meters
Completion of the construction operations for the Cultural Museum of Sacred Defense, with a total built area of 5,000 square meters across 2 to 4 floors, using a concrete frame structure along with a concrete slab and shear walls. The museum's air conditioning system consists of 2 chiller units, each with a capacity of 120 tons, 6 multi-split units, each with a capacity of 30 tons, and 5 air handling units, each with a capacity of 4,000 CMF
The completion of the skeleton and the implementation of phases one and two of a section of the Grand Mosque of Sadra City
Sadra New City Development Company
Formboom Consulting Engineers
Shiraz city