Tunnel excavation: 30,000 cubic meters Concrete pouring: 12,600 cubic meters Reinforcement: 2,000 tons Layout: 40,000 square meters Meshing: 210 tons
Excavation of a 2 km long tunnel with a cross-sectional area of 90 square meters, which will bring the distance between Bandar Abbas to New Alavi city by about 35 km. The type of soil in the excavation site is semi-stable
Additional tunnel excavation and lining operation from Alavi city to Shahid Rajaei border
New Alavi Construction Company
Etihad Rah Consulting Engineers
Hormozgan Province - Bandar Abbas