Brief Description and Objectives of the Project
Railway substructure of the metro route between Golshahr Station and Mehrshahr Terminal in Karaj, with a length of 1,800 meters, including the execution of related structures
Concrete retaining wall with a height of 8 to 12 meters
Drainage channel for surface water parallel to the railway track with a length of 1,800 meters
Construction of the Imamzadeh Mohammad Bridge as a concrete box with a span of 20 meters
Fencing along the railway route with a length of 1,800 meters