Earthworks: 75,000 cubic meters Reinforcement: 400 tons Layout: 13500 square meters Concreting: 8000 cubic meters Implementation of polyethylene water supply network: 9000 meters long Implementation of steel network: 6700 meters long Implementation of weak and medium pressure cables: 54000 meters long Network cable: 6000 meters long
Implementation of all piping, cabling and creation of water and waste channels and construction of electric and lighting masts and poles and other infrastructural facilities in the area of Arak Anodizing Factory.
Implementation of the operation of the facilities under the construction of the Arak Anodizing Factory
Sanat Amir Kabir Carbon Company
Ayman Intersection Consulting Engineers
Markazi Province