Earthworks: 24,000 cubic meters Consolidation operation: 2500 square meters Reinforcement: 900 tons Formatting: 7000 square meters Concreting: 6500 cubic meters
The construction of an industrial shed with a substructure of 3000 square meters and a height of 12 meters with a work shop canopy, and the construction of a 4-story office building with a substructure of 2300 square meters, and the stabilization and construction of the protective wall of the Nouri Petrochemical site’s flare
Stabilization operation of trench and construction of Nori Petrochemical concrete workshop
Nouri Petrochemical Company
Jahan Pi Saman
Bushehr