Deck area of the bridges: 5,200 square meters Reinforcement and light steel works: 2,000 tons Heavy steel works: 1,000 tons Earthworks: 1,000,000 cubic meters Formwork: 26,000 square meters Concrete pouring: 20,000 cubic meters Excavation and pile execution: 5,200 meters in length
The construction of a two-level grade-separated intersection at the junction of Azadegan Freeway and Saeed Abad-Saveh Freeway, designed as an overpass, including two parallel bridges, ramps, and four access loops with a cumulative length of 1,400 meters. The deck structure of these bridges is composite, consisting of a steel box combined with a concrete slab, with a cumulative length of 220 meters and a total width of 47 meters
Grade-separated intersection of Azadegan Freeway and Saeed Abad Freeway
Tehran Engineering and Urban Development Organization
Ardam Consulting Engineers
Tehran, Azadegan Freeway