Reinforcement: 4,200 tons Concrete pouring: 50,000 cubic meters Formwork: 70,000 square meters Earthworks: 400,000 cubic meters Insulation of ceiling and walls: 64,700 square meters
The underpass structure includes a box and a concrete arch ceiling with a length of 2,440 meters It also features a box with columns constructed using cast-in-place piles and a flat roof with a length of 265 meters The construction of the central structure of the existing stations along the route is 300 meters longThe underpass is executed using the cut-and-cover method
Section 3 of Phase 2, North-South Line of Isfahan Urban Railway
Isfahan Urban and Suburban Railway Organization
Hexa Consulting Engineers
Isfahan City