Excavation: 110,000 cubic meters Backfilling: 100,000 cubic meters Tunnel Drilling: 1,530 meters Tunnel Framing: 2,500,000 kilograms Shotcrete: 400,000 square meters Formwork: 60,000 square meters Concrete Pouring: 25,000 cubic meters Reinforcement: 1,600 tons
Implementation of the second runway section of the Azadi Tunnel, along with the exit route, to facilitate traffic entering and exiting the city of Ilam and to reduce the transit traffic on the Karbala route
Execution operations for the second runway of section two of Ilam
Company for the Construction and Development of National Transportation Infrastructure
Farber Consulting Engineers
Ilam