پرش به محتوا
  • English
  • خدمات ما
  • صفحات
  • خدمات ما
  • صفحات

Shohada Metro

  1. Home
  2. »
  3. EN
  4. »
  5. Shohada Metro Project – Mashhad

Perform executive operations

Reinforcement and light steel works: 5,250 tons
Heavy steel works: 500 tons
Formwork: 15,000 square meters
Concrete pouring: 46,000 cubic meters
Tunnel excavation: 75,000 cubic meters

Brief description and purpose of the project

Here’s the translation of your text into English
Execution of Operations for the N3 Line (Third Line) and G4 Line (Fourth Line) Stations at Shohada Square in Mashhad using the rib and pile method at a depth of 30 meters below the groundwater level
Complete execution of access galleries, advance galleries for the shaft, and patrol tunnels, including tunnel excavation, construction of retaining structures, and execution of lining and main structures. Construction of supplementary accesses for stations, ticket hall, train platform, etc

Title

Execution of Construction Operations for N3-G4 Stations of Metro Lines 3 and 4 at Shohada Square, Mashhad

Employer

Mashhad Urban and Suburban Railway Company

Consultant

Sazban Pajouh Consulting Engineers

location

Mashhad City

Donec Sodales Sagittis Magna. SedConsequat, Leo Eget Bibendum Sodales, Augue Velit Cursus Nunc, Quis Gravida Libero.

Important Links

  • Terms and Conditions
  • Legal
  • Business
  • Partners

Services

  • Homepage
  • Home
  • About Us
  • Amenities
  • Pricing
  • Contact

Quick Links

  • Homepage
  • Home
  • About Us
  • Amenities
  • Pricing
  • Contact

Contact

Old Westbury 256, New York
11201,United States

Let’s Connect!

Connect with entrepreneurs, build your network, make great business.

Company

We Protect & Support Your Business

Support

If you have a General enquiry, please drop me an email

Email: support@motivo.com

Copyright © 2023 Saga. Designed & Developed by MotivoWeb only on Envato Market.

Copyright © 2026 شرکت نصیر عمران آریا

Powered by شرکت نصیر عمران آریا