Title | Executive operations of construction of main and side buildings and landscaping of Sepid Dasht railway station |
Contractor | Company for the construction and development of the country’s transportation infrastructure |
Consoler | Paul Mir consulting engineers |
Location | Chahar Mahal Bakhtiari |
comments | Construction of main buildings, side buildings and landscaping of Sepid Dasht railway station on Mobarakeh-Sefid Dasht-Shahrkord railway axis |
The operation | 1- Reinforcement: 510,000 kg 2- Molding: 7000 square meters 3- Concreting: 3700 cubic meters 4- Steel works: 250,000 kg 5- Curtain wall: 1000 square meters 6- Piping 35000 meters long 7- Excavation of 26,000 cubic meters |