Title: | Stabilization operation of trench and construction of Nori Petrochemical concrete workshop |
Contractor: | Nouri Petrochemical Company |
Consultant: | Jahan Pi Saman |
Location: | Bushehr |
Summary Project objective: | The construction of an industrial shed with a substructure of 3000 square meters and a height of 12 meters with a work shop canopy, and the construction of a 4-story office building with a substructure of 2300 square meters, and the stabilization and construction of the protective wall of the Nouri Petrochemical site’s flare. |
The operations: | 1- Earthworks: 24,000 cubic meters 2- Consolidation operation: 2500 square meters 3- Reinforcement: 900 tons 4- Formatting: 7000 square meters 5- Concreting: 6500 cubic meters
|