Project Title: | Completion of Station (N3-G4) of 3rd line of Mashhad Subway (Shohada Sqr.) |
Client: | Mashhad Urban Railway Company |
Consultant: | Sazbon Pajooh Consulting Engineers Co. |
Project Location: | Mashhad city, Iran |
Project Description: | • Completing the construction of Station N3 • Constructing the retaining structure in Rib & Pile method at level of -30m of Groundwater Level. • Implementing the Access Galleries, Ventilation Galleries, and Mid Tunnel Ventilations, including Excavating and Constructing the retaining structure and main structure of the Tunnels and Shafts. • Construction of supplementary access ways of stations, ticket hall, train platform, elevator shaft, etc. |
Key Statistics: | • Reinforcement and Steel Works: 5,250 tons • Heavy Steel Works: 5,000 tons • Formwork: 15,000 m² • Concrete: 46,000 m³ • Tunnel Excavation: 75,000 m³ |