Project Title: | Completion of Subway Route between Golshahr station to Mehrshahr terminal |
Client: | Tehran Urban and Suburban Railway Company |
Consultant: | Rahsaaz Tarh Consulting Engineers Co. |
Project Location: | Karaj city, Alborz province, Iran |
Project Description: | Railway substructure of subway route between Golshahr station to Mehrshahr terminal of karaj with the length of 1800 m along with related constructions including: • Concrete retaining walls with the hight of 8 to 12 m. • Canals for collecting surface water parallel to the railway route with the length of 1800 m. • Construction of Imam zadeh Muhammad Bridge with span length of 20 m and in form of concrete box. • Surrounding fence of railway route with the length of 1800 m. |
Key Statistics: | • Reinforcement: 2,500 tons • Steel works: 400 tons • Concrete: 73,000 m³ • Formwork: 95,000 m² • Precast Concrete: 3,000 m² • Earthwork: 350,000 m³ |