Title | Amirkabir Arak industry carbon anodizing plant construction project |
Contractor | Amirkabir Sanat Carbon Company |
Consoler | Ayman Intersection Consulting Engineers Co |
Location | Arak city |
comments | About: performing all the pipe line operations, cable operations, ad making water and sewage channels, building power masts and towers and other infrastructure installations in the anodizing carbon factory location The project objectives: constructing Arak Amir Kabir Sanat: the anodizing carbon factory |
The operation | 1. Land operations: 75000 m3 2. Armature: 400 tons 3. Formatting :13500 m2 4. Concreting :8000 m3 5. Water and sewage network : 5464 m long 6. Polyethylene watering network : 8696 m long 7. Steel network (steamed ):1800 m long 8. Steel firefighting network : 881 m long 9. Medium voltage cable : 6595 m long 10. Low voltage cable : 39915 m long 11. Network cable : 4970 m long 12. Telephone cable : 3000 m long 13. Free lights : 134 |