Title |
Constructing Arak Amir Kabir Sanat: the anodizing carbon factory |
Contractor |
The Amirkabir sanat carbon company |
Consoler |
Eimantaghato Consulting Engineers Company |
Location |
Arak city |
comments |
About: performing all the pipe line operations, cable operations, ad making water and sewage channels, building power masts and towers and other infrastructure installations in the anodizing carbon factory location
The project objectives: constructing Arak Amir Kabir Sanat: the anodizing carbon factory |
The operation |
1. Land operations: 75000 m3
2. Armature: 400 tons
3. Formatting :13500 m2
4. Concreting :8000 m3
5. Water and sewage network : 5464 m long
6. Polyethylene watering network : 8696 m long
7. Steel network (steamed ):1800 m long
8. Steel firefighting network : 881 m long
9. Medium voltage cable : 6595 m long
10. Low voltage cable : 39915 m long
11. Network cable : 4970 m long
12. Telephone cable : 3000 m long
13. Free lights : 134 |