Title: | Constructing the building for manufacturing Avian Influenza |
Contractor: | Razi Vaccine and Serum Research Institute |
Consultant: | Khak sang sazeh Consulting Engineers Company |
Location: | Marand |
Summary Project objective: |
the executive operation of the building for manufacturing Avian Influenza including excavation, foundation, steel design , composite ceilings, electrical and mechanical installation in the area of 5700 m2 the project objective: Constructing the building for manufacturing Avian Influenza |
The operations: |
1. the land operation : 16000 m3 2. heavy steel work: 400 tons 3. steel fixer: 200 tons framework: 12000 m3 4. concreting: 3000 m3 5. the fire proof coating of steel design:30000 m3 6. the electrical and mechanical installation |