Project Title: | IMAM HUSSEIN Interchange |
Client: | Zanjan Municipality |
Partnered Consultant: | Karane Be Karane Pars Consulting Engineers Co. |
Type of Contract: | EPCProject |
Location: | Zanjan city, Iran |
Project Description: | Engineering, Procurement, and Construction of a three-level interchange at the intersection of Zanjan-Bijar highway and Shahid Beheshti boulevard, including an overpass bridge, an underpass, two U-Turns and access ramps in order to improve the traffic flow of the junction. • +1 level of the interchange is an overpass in form of CABLE-STAYED Bridge with the total length of 485 m and maximum span length of 120 m, including Composite Deck, Steel PYLON, and sheathed STAY CABLES. • -1 level of the interchange is an underpass with the total length of 450 m, which the deck part is in form of in situ concrete voided slab. • The retaining walls of the underpass are in form of in situ concrete bored piles which are cladded by precast concrete segments. |
Key Statistics: | • Area of Bridges Deck: 4,000 m² • Reinforcement and Steel Works: 2,500 tons • Heavy Steel Works (Pylon & Deck): 900 tons • Formwork: 16,000 m² • Concrete: 30,000 m³ • Sheathed Stay Cables: 15 tons • Pile Drilling: 10,000 ml • Wall Precast Segments: 3,000 m² • Earthworks: 210,000 m³ • Asphalt Surfacing: 12,000 tons |