Title | Construction of the entrance road and uneven intersections of the Gohar Park tourist village site |
Contractor | Consulting Engineers of Garneau Design |
Consoler | Consulting Engineers of Pioneers of Southern Steel |
Location | Kerman |
comments | Construction of three bridges and construction of access ramps to the site of the tourist village of Gohar Park in Sirjan, in order to provide safe access to the park |
The operation | 1- Earthworks: 70,000 cubic meters 2-Pile drilling: 500 meters long 3- Heavy steel works: 450 tons 4- Light steel works: 1100 tons 5- Concreting: 10,000 cubic meters 6- Paving: 50,000 square meters |