Project Title: | Third section of Phase No.2 of Isfahan Urban railway, North-South Line |
Client: | Isfahan Urban and Suburban Railway Co. |
Consultant: | Hexa Consulting Engineers Co. |
Project Location: | Isfahan city, Isfahan province |
Project Description: | Subway structure including a concrete Box & Vault with length of 2,440 m Construction is performed with the method of Cut & Cover. Construction of existent station with the length of 300 m. |
Key Statistics: | • Reinforcement: 4,200 tons • Concrete: 50,000 m³ • Formwork: 70,000 m² • Earthwork: 400,000 m³ • Insulation Of Roof & Walls : 64,700 m² |